Skip to main content
90 Sekunder Play
Search Menu

Flaring container

In the autumn of 2021, all national chemical units in Sweden will have access to flaring of energy gas. One scenario could be a tank truck transporting methane gas, that drives into a ditch and suffers damage to the double jacketed tank. When the temperature rises, the pressure increases, and after 5-7 hours, the pressure will be so high that a safety valve risks being triggered, leading to a leakage of flammable gas. The ability to use controlled flaring of the gas is a way of solving the problem.

Participants

  • Leif Hylander. Head of Rescue Operations / Perstorp Fire and Rescue Services
Photo:
  • Leif Seger
  • Christer Nilsson
Edit:
  • Leif Seger